Interior Design at The MINH, Mont Kiara

The MINH is UEM Sunrise’s freehold development on Jalan Kiara in Mont Kiara — two 42-storey towers, 496 units, four layouts from 1,607 to 3,010 sq ft, launched in May 2023 under an Indochine design expression the developer describes as French colonial elegance meeting Vietnamese tradition. It is a building bought largely off-plan, which means most of its owners will meet their unit for the first time at handover, with the developer’s aesthetic already installed and a decision to make: live with it, adapt it, or replace it. This page answers the questions that decision raises — what a MINH unit arrives with, what the developer and then the management permit, and how a full fit-out is designed and built so it is finished once. Blaine Robert Design designs and builds high-rise homes across Kuala Lumpur — Four Seasons Residences, The Pearl KLCC and Park Regent are in the portfolio — and this is how we would approach yours.

Open-plan kitchen behind the dining area of a three-room apartment at Four Seasons Place, Kuala Lumpur, designed by Blaine Robert Design

The Building and Its Four Layouts

The MINH is two 42-storey towers with 496 units between them, on Jalan Kiara in the enclave’s established core. The developer’s release describes four layouts: Type A at 149 square metres, or 1,607 sq ft, rising through Types B and C to Type D at 279 square metres, or 3,010 sq ft. Every plan was drawn open — the developer’s architects speak of a seamless transition from one area to another and a spacious open-plan layout in every unit — which gives a designer a clean floor to work with and a family a set of decisions the plan does not make for them: where the dining stops and the living starts, whether the kitchen is a room or a wall, where a study goes. The base finish is the building’s signature: an Indochine palette — timber, pattern and colonial reference, on the developer’s own description — that reads beautifully in the show unit and belongs to the developer, not to the owner. The design question at The MINH is not what to put in an empty box; it is what to keep from a scheme someone else chose.

42 storeystwo towers, 496 units, freehold
1,607 – 3,010 sq ftTypes A to D, as published
Four Seasons Residencesour completed residence, Kuala Lumpur

How JMB and MC approvals work across Malaysian condominiums in general is set out in our condo interior design guide; this page applies them to a building whose owners are still deciding, before handover, what their unit will be.

Design Considerations for a MINH Unit

The decisions that shape a fit-out at The MINH, from the show-unit visit to handover — the same luxury residential interior design service, applied to a home that arrives with a point of view already installed.

01

Keep, Adapt or Replace the Indochine Base

The developer’s scheme is coherent and it is not neutral. Owners who love it should keep its bones — the timber, the proportions, the softened light — and add conviction where the show unit stopped: a bookmatched marble wall in the living hall, brass and dark stone in the kitchen, pieces from houses like Giorgetti or Poliform that answer the colonial reference rather than fight it. Owners who do not love it should decide that before handover, because replacing a base finish after moving in is the expensive order of work.

02

Making Rooms in an Open Plan

The MINH’s layouts are deliberately open, and open plans are where families lose acoustics, air-conditioning efficiency and privacy. The plan we draw makes rooms without walls — a joinery spine that carries the television on one face and the dining storage on the other, a change of ceiling height over the dining, a kitchen island that is the room’s edge — and zones the air-conditioning so the living hall is not cooling the corridor.

03

Type A Done Properly, Type D Done Fully

At 1,607 sq ft a Type A is a two- or three-bedroom plan where every wall has to earn its place: floor-to-ceiling joinery on the circulation, a foyer built in, a kitchen that is a piece of furniture. At 3,010 sq ft a Type D is a family home in the sky, with room for a proper dry-and-wet kitchen split, a study, a dressing room carved from a bedroom, and stone at a scale that the smaller plans cannot carry.

04

Kitchens

The show unit’s kitchen is a set. A working kitchen for a Mont Kiara family is a plan: island or galley, wet kitchen or not, and appliances from the Gaggenau, Miele or V-ZUG tier where the owner cooks. We draw it from how the household eats, then detail the stone, the joinery and the extraction to a specification the developer’s finish was never meant to meet.

05

Bathrooms, Light and Air

Bathrooms are the rooms the management will care most about, because of waterproofing, and the rooms an Indochine scheme most wants to keep — the patterned tile and timber vanities the style tends to use date fast. We upgrade fittings to the Villeroy & Boch, TOTO or Axor tier where the owner wants it and leave warranted waterproofing alone. Then layered lighting on separate circuits to replace the show unit’s single mood, air-conditioning zoned for a family, and a Lutron or KNX layer where the home should run itself.

THE MINH, MONT KIARA

Fitting Out at The MINH: The Declaration Comes First

The MINH hands over with a designed base finish, and that changes what an approval is. In a bare unit the developer asks what you are adding; here UEM Sunrise asks what you are removing — because every Indochine floor, wall treatment and fitted piece the developer installed is under its defect warranty until it is taken out. A fit-out at The MINH therefore starts with a declaration, not a drawing: a schedule of every developer finish the design keeps, adapts or replaces.

The Keep-or-Replace Schedule

We walk the unit against the developer’s handover list and produce the schedule room by room: kept as delivered, adapted in place, or removed and replaced. That schedule goes into UEM Sunrise’s fit-out submission with the drawings, the contractor registration and the deposit, and it is what the developer’s site team checks against when the work is inspected. It also protects the owner — a warranted item declared as kept stays warranted; one removed without declaration voids the warranty on more than itself. When the joint management body forms after vacant possession, its by-laws on hours, the service lift and common-property protection sit alongside the developer’s conditions, and we carry the same schedule to it.

01

What Can Come Out, and What Cannot

The Indochine flooring, wall treatments and fitted joinery can be replaced once declared; the patterned finishes an owner does not want are not a permanent condition of the unit. Partition walls can generally be replanned in the open-plan layouts. What stays is the structure — columns, shear walls, the wet-area slabs — and the façade and window openings, which belong to the building. Where a bathroom’s waterproofing is under the developer’s warranty it is left in place unless the design rebuilds the room to the building’s standard with an inspection.

02

The MINH File, in Outline

Keep-or-replace schedule against the developer’s handover list · UEM Sunrise fit-out submission with drawings, contractor registration and deposit · warranty preserved on every finish declared as kept · JMB by-laws on hours, service lift and common property once the body is formed · structure, façade and window openings as built · warranted waterproofing left in place unless rebuilt to standard and inspected. How the fees and the fit-out budget are structured for a new condominium is set out in our interior design cost guide.

Decide before handoverkeep, adapt or replace, drawn against the plan
A few months on sitelonger where the base finish is replaced
PROJECT TIMELINE

How Long a MINH Fit-Out Takes

The shortest programme at The MINH belongs to the owner who decides before the keys arrive. Concept, 3D visualisation and technical drawings can be completed against the developer’s plans and the show unit while the building is being finished, so the fit-out application goes in with vacant possession. Site work that adds kitchen, joinery, lighting and furniture to the developer’s base typically runs a few months; a fit-out that lifts the Indochine flooring and wall finishes and starts again runs longer and brings the warranty declarations into it.

We give you a programme at the design stage with the developer’s approval window and the lift booking shown as their own line items, and we manage it ourselves through to handover — so the deposit, the working-hour rules and the warranty declarations are ours to keep, not yours.

INVESTMENT GUIDE

What Shapes the Cost of Interior Design at The MINH

Scope,not square footage alone

Three things move the number on a MINH unit: how much of the developer’s Indochine base is kept, whether the kitchen and bathrooms are re-fitted, and the tier of stone, joinery and appliances. A fit-out that keeps the floors and wall finishes and adds what the show unit lacks sits in a different band from one that replaces the base and starts from the slab; the condo interior design guide explains how we approach high-rise homes.

Two more apply particularly here. A 1,607 sq ft Type A and a 3,010 sq ft Type D are different projects before a finish is chosen, and the building’s designed base means the first cost decision is a subtraction, not an addition — what comes out before anything goes in. We agree the budget at the start of the design stage and design to it.

Under One Roof

Most firms in Malaysia design or build. We are an interior design studio and a construction team, which means the drawings, the joinery and the site work answer to one project manager rather than three contractors blaming each other.

01

Interior Design

Concept, space planning, 3D visualisation, technical drawings, material specification, lighting design and fitted joinery detail, resolved to a level that can actually be built.

02

Construction

Managed construction by our own team: structural alterations, mechanical and electrical, wet works, finishing trades and site management, sequenced under one programme.

Our High-Rise Work in Kuala Lumpur

Our completed homes at Four Seasons Residences, The Pearl KLCC and Park Regent are the references for how we handle a managed tower — approvals managed, structure respected, and the result finished to a standard the building’s own show unit never reached. Ask us and we will walk you through any of them in full.

Kuala Lumpur

A completed high-rise home in the KLCC corridor — an open kitchen made into a room, with joinery designed and delivered by our interior design and construction team.

Kuala Lumpur

A residence in the KLCC corridor — a study carved from an open plan, storage on the circulation walls, and the building’s rules managed from application to handover.

Desa ParkCity, Kuala Lumpur

A completed residence at Park Regent — the scale of the larger MINH layouts, with stone, backlit panels and joinery carried through as one scheme.

MINH owners choose us for one reason first: the same company draws the unit and builds it. A fit-out here involves the developer’s approval, warranty declarations on a designed base finish, joinery, stone, M&E and a service-lift booking shared with hundreds of new owners — and with one programme and one point of contact, none of that is yours to manage.

WHY BLAINE ROBERT DESIGN

Why Choose Blaine Robert Design for Your MINH Unit

Completed high-rise homes at Four Seasons Residences, The Pearl KLCC and Park Regent: the proof for a managed-tower fit-out is a short drive from Mont Kiara, and the same team would work on your unit.

02

Loud Luxury, Delivered Under One Roof

Interior design and construction sit inside one company, so the wardrobe drawn in your 3D visual is the wardrobe that gets made. One contract, one schedule, one accountable team.

Recognition to match: Luxury Lifestyle Awards 2021, ATAP Design Awards 2021, Qanvast Design Awards 2021 and 2023, MIIP 2022, and ISO 9001:2015 certified quality management.

03

A Studio That Works Across Borders

Blaine Robert is an invited judge of the PropertyGuru Asia Property Awards, and the studio was named in PropertyGuru’s 10 Best Interior Design Firms in Malaysia, 2026 edition. Mont Kiara sits inside a practice that works across Kuala Lumpur, Selangor and beyond.

Frequently Asked Questions About Interior Design at The MINH

Blaine Robert Design portfolio montage of luxury residential interiors, Kuala Lumpur

Have you completed a unit at The MINH?

Not at The MINH yet. Our completed high-rise homes in Kuala Lumpur include Four Seasons Residences, The Pearl KLCC and Park Regent, all in the portfolio, and the same team would work on your unit.

Speak to Us About Your MINH Unit

If you own a unit at The MINH and are planning the fit-out — before or after the keys — talk to us. We will visit the show unit with you, read the plan, and tell you plainly what the unit can become, with the developer’s approvals handled as part of the project.

START YOUR PROJECT

Let’s Create Something Original

Every exceptional space begins with a conversation.

30+

YEARS OF
EXPERIENCES


250

PROJECTS 
DELIVERED

ACROSS 3 COUNTRIES
MALAYSIA . UAE . INDIA

TELL US ABOUT YOUR PROJECT

We’d love to hear about your vision.

OR

Speak with our team on WhatsApp
for a quick consultation or project enquiry.